Logo
Vidira AI

How It Works

AI-powered permitting that benefits everyone—from submission to approval.

Submit perfect applications in 3 simple steps. No more clarification requests, no more revision cycles, no more surprises.

1

Upload Your Plans

⏱️ 2 minutes
What You Do Icon

What You Do:

Drag and drop your CAD files, PDFs, site plans, and engineering drawings. All standard formats accepted (DWG, DXF, PDF, JPG, PNG).

Behind the Scenes Icon

What Happens Behind the Scenes:

  • arrowAI reads every dimension, calculation, and specification from your plans
  • arrowAutomatically organizes files and creates version history
  • arrowExtracts property data from city GIS integration
  • arrowCross-references all documents to build complete project model
Accuracy Icon

“Can AI really read my plans accurately?”

Yes, 99.2% accuracy. Our computer vision technology is trained on 50,000+ approved plan sets from 40 cities. More accurate than manual data entry because there’s no human transcription error. Our AI misses only 0.8%.

Example Icon

Example: What AI Extracts in 2 Minutes From Your Floor Plan

Setbacks: Front 18.2 ft, Rear 22.5 ft, Sides 7.3 ft / 9.1 ft
Building footprint: 3,847 sq ft (calculated from boundary)
Lot coverage: 38.2% (lot size 10,070 sq ft, compliant < 40%)
Parking spaces: 47 total (4 standard + 3 ADA-compliant)
Building height: 42.5 ft from grade to highest roof point
Fire lane clearances: 24 ft both sides (meets city standard)
2

Get Instant Validation

⏱️ 30 seconds
What You Do Icon

What You Do:

Click "Validate" and watch the real-time compliance check run across all city requirements. The system processes hundreds of rules simultaneously.

Behind the Scenes Icon

What the AI Checks Against:

  • arrowZoning compliance (setbacks, height limits, density, FAR, permitted uses)
  • arrowBuilding codes (IBC structural, fire safety, egress, accessibility, energy)
  • arrowCivil requirements (drainage, stormwater, utilities, flood zones, easements)
  • arrowDocument completeness (all required reports, stamps, authorizations present)
  • arrowCurrent ordinances (including amendments from last 30 days—updated weekly)
Live Ordinance Icon

“What if the AI is checking against outdated rules?”

Live ordinance updates.  We maintain direct partnerships with cities to sync ordinance databases weekly. When Austin changed mixed-use parking requirements in March 2024, it was in our system within 48 hours. Traditional submissions: 23 projects rejected in April for using old standards. Vidira.ai users: 0 rejections—system auto-updated.

Example Icon

Your Validation Report: 50-Unit Apartment Building Example

COMPLIANT

Setbacks:

Front 18.2 ft (req. 15 ft min), Rear 22.5 ft (req. 20 ft min), Sides 7.3/9.1 ft — All meet requirements

COMPLIANT

Density:

49.7 units/acre calculated (max 50 units/acre permitted in MU-2 zoning district)

ATTENTION

Parking:

47 spaces provided, 45 required. Consider adding 1 space for interpretation differences.

MISSING DOCUMENT

Traffic Impact Analysis:

Required for residential projects >40 units per City Ordinance 2024-0312.

View approved vendor list and study requirements
CODE VIOLATION

Impervious Cover:

Calculated at 72.3%, exceeds 70% maximum for watershed zone WS-3.

Apply for impervious cover variance
3

Fix Issues & Submit

⏱️ Your timeline
What You Do Icon

What You Do:

Address flagged issues on YOUR schedule, add missing documents, adjust plans as needed. Re-validate unlimited times until everything shows green. Then submit with one click—knowing it's perfect.

Behind the Scenes Icon

What Happens After Submission:

  • arrowDigital submission to city with validation certificate automatically attached
  • arrowCity receives your application marked as "pre-validated" in their system
  • arrowMany jurisdictions offer fast-track review for validated applications (Austin: 3-5 days vs. 15-21)
  • arrowTrack review status in real-time on your dashboard—see which departments are reviewing
  • arrowReceive city reviewer comments digitally on platform—no more phone tag or lost emails
Live Ordinance Icon

“What if the city still finds issues the AI missed?”

Financial guarantee + priority support.  If city reviewers find something our AI validation missed, we cover resubmission fees up to $2,500 AND provide priority support to coordinate the fix. This hasn't happened in 8 months across 400+ validated projects. Our triple-layer verification (AI → Your review → City review) catches 99.7% of issues.

Results Icon

Real Results From Our Users:

70%

Approved with ZERO clarification requests

3–5 days

Average approval time (vs. 15–21 days traditional)

$47K

Average savings per project in holding costs

2.8x → 1.0x

Revision cycles: industry avg → with Vidira

The Bottom Line:Side-by-Side Reality Check

Traditional Submission

  • Day 1: Submit plans, cross fingers
  • Day 14: Receive rejection—"Missing traffic study"
  • Day 15-19: Scramble to order study from engineer ($8K)
  • Day 20: Resubmit with study, back in queue
  • Day 34: Second rejection—"Impervious cover exceeds limit
  • Day 35-40: Architect redesigns parking lot
  • Day 41: Third submission attempt
  • Day 55: Approval finally issued

Total: 55 days, 3 cycles, $34K in delays + consultant fees

With Vidira.ai

  • Day 1, 10:00 AM: Upload plans, validate in 3 minutes
  • Day 1, 10:05 AM: See ALL issues immediately (traffic study + impervious)
  • Day 1, 2:00 PM: Order traffic study, architect starts parking redesign
  • Day 1, 4:00 PM: Adjusted plans re-validated—impervious now compliant
  • Day 6: Traffic study arrives, upload and re-validate
  • Day 6: 100% compliant validation—submit to city with certificate
  • Day 11: City approval issued—zero clarifications needed
  • Day 11: Download digital permit, schedule inspections

Total: 55 days, 3 cycles, $5K in delays + consultant fees

Try It Free on Your Next Project

Validate your first application free. See every issue before the city does. No credit card required.

No credit card required
Results in 3 minutes
Your plans stay private