AI-powered permitting that benefits everyone—from submission to approval.
Submit perfect applications in 3 simple steps.
No more clarification requests, no more revision cycles, no more surprises.
What You Do:
Drag and drop your CAD files, PDFs, site plans, and engineering drawings. All standard formats accepted (DWG, DXF, PDF, JPG, PNG).
What Happens Behind the Scenes:
“Can AI really read my plans accurately?”
Yes, 99.2% accuracy. Our computer vision technology is trained on 50,000+ approved plan sets from 40 cities. More accurate than manual data entry because there’s no human transcription error. Our AI misses only 0.8%.
Example: What AI Extracts in 2 Minutes From Your Floor Plan
What You Do:
Click "Validate" and watch the real-time compliance check run across all city requirements. The system processes hundreds of rules simultaneously.
What the AI Checks Against:
“What if the AI is checking against outdated rules?”
Live ordinance updates. We maintain direct partnerships with cities to sync ordinance databases weekly. When Austin changed mixed-use parking requirements in March 2024, it was in our system within 48 hours. Traditional submissions: 23 projects rejected in April for using old standards. Vidira.ai users: 0 rejections—system auto-updated.
Your Validation Report: 50-Unit Apartment Building Example
Setbacks:
Front 18.2 ft (req. 15 ft min), Rear 22.5 ft (req. 20 ft min), Sides 7.3/9.1 ft — All meet requirements
Density:
49.7 units/acre calculated (max 50 units/acre permitted in MU-2 zoning district)
Parking:
47 spaces provided, 45 required. Consider adding 1 space for interpretation differences.
Traffic Impact Analysis:
Required for residential projects >40 units per City Ordinance 2024-0312.
Impervious Cover:
Calculated at 72.3%, exceeds 70% maximum for watershed zone WS-3.
What You Do:
Address flagged issues on YOUR schedule, add missing documents, adjust plans as needed. Re-validate unlimited times until everything shows green. Then submit with one click—knowing it's perfect.
What Happens After Submission:
“What if the city still finds issues the AI missed?”
Financial guarantee + priority support. If city reviewers find something our AI validation missed, we cover resubmission fees up to $2,500 AND provide priority support to coordinate the fix. This hasn't happened in 8 months across 400+ validated projects. Our triple-layer verification (AI → Your review → City review) catches 99.7% of issues.
Real Results From Our Users:
70%
Approved with ZERO clarification requests
3–5 days
Average approval time (vs. 15–21 days traditional)
$47K
Average savings per project in holding costs
2.8x → 1.0x
Revision cycles: industry avg → with Vidira
Total: 55 days, 3 cycles, $34K in delays + consultant fees
Total: 55 days, 3 cycles, $5K in delays + consultant fees
Validate your first application free.
See every issue before the city does. No credit card required.